Ramp Information
Save Time, Money and Mess with an Alternative Solution
Made from 100% recycled tire rubber (green building), True Systems offers an alternative to cold mix and asphalt cement when trench plating and/or grinding edges for repaving.
Code requirements state that fine grade asphalt concrete shall be compacted to form ramps with maximum slope of 8.5% with a minimum of 12 inches taper to cover all edges of the steel plates on the pavement. True System Ramp offers a solution to code requirements that saves time, money and mess.
With a simple installation, our ramp provides a smooth transition between the trench plate and the roadway. It also expedites the time it takes to close the work area and re-open the roadway to traffic.
As an alternative to cold mix and asphalt cement, installation and removal is easy. With the traditional method there is the probablility of some material that will be washed down storm drains, but with this product there is NO mess and no polution. True Systems Ramps are durable and reusable, which saves you time and money.
| Costs For: | Asphalt Mix | True Systems Ramp |
|---|---|---|
| Equipment: | Dump Truck Tractor | NONE |
| Labor: | 3 or more people Labor Costs | 1 person Labor Costs |
| Material: | Asphalt/Cold mix | Reusable Ramp |
| TOTALS: | Money, Time and Mess | Less Money, Less Time, NO MESS |